Projects/Clients :

Ceramic Industries

1.Madhusudan Ceramics Ltd.

An Effluent Treament Plant (ETP) consisting of Physico-chemical treatment units was designed and commissioned by CA. The ETP has a capacity to treat 200 cu.m/day of effluent. The cost of the project was Rs. 0.4 Million and the plant was successfully commissioned in 1986.

Back

2.Somani Pilkington Ltd.

Somani Pilkington Ltd. have their ceramic manufacturing plant at Kadi, Gujarat, India. An Effluent Treament Plant (ETP) consisting of Physico-chemical treatment units was designed and commissioned by CA to treat 250 cu.m/day of effluent. The total cost of the project was Rs. 0.6 Million and the plant was successfully commissioned in 1987.

Back